Click on the Picture for a more detailed view.

This page is dedicated to Paul who could not be with us this year. We miss you Paul.

This Year's Collaboration



from left to right:

Bernhard Lauss, Steve Clayton, Robert Carey, David Hertzog, Ken Crowe, Chris Polly, Dan Chitwood, Peter Kammel, Andrea Sharp, Rahul Roy, Fred Gray, Matthew Hare
Not Apearing:

Paul Debevec, Gerco Onderwater, James Miller

PSI

this year's mascot Bimbo! A message from Dan

The Beam Line Piece by Piece

Beam pipe at QSB72 Close up of beam pipe at QSB72 Pipe extension at QSB72
the wire chambers the wire chambers
the wire chambers The Gas regulation
system for the Wire Chambers
Initial counter setup S1 and S2 are overlapped by 4.8cm
Another view of the initial setup
showing the electron telescope
angling down and back at 45
degrees in both planes.
150 micron T0 scintillator is mounted
dirrectly on the end of the beam
pipe. S1 and S2 are both 1/4 inch
scintillators.
S1 and S2
The silicon Detector The silicon Detector close up

The Second Setup

The Second Setup
Now we have S1 and S2
right next to the
window.
Followed by S1 and S2
is the Wire Chamber
Here is the view as
the telescope
detector would
see it.
Fred opening the beam stop,
possibly thinking about
radiation.
An early plot from the Wire Chambers Computers NEVER die!

A Night Out

Roberto P.I.
MMmmmmmm Muons! Dessert.
The sun setting on the PSI Valley. The Hills are Alive ... Bilingual