PSI |
|
|
|
| this year's mascot Bimbo! | A message from Dan |
The Beam Line Piece by Piece |
|
|
|
|
| Beam pipe at QSB72 | Close up of beam pipe at QSB72 | Pipe extension at QSB72 |
|
|
|
| the wire chambers | the wire chambers |
|
|
|
| the wire chambers |
The Gas regulation
system for the Wire Chambers |
|
|
|
| Initial counter setup | S1 and S2 are overlapped by 4.8cm |
|
|
|
| The silicon Detector | The silicon Detector close up |
|
|
| The Second Setup |
|
|
|
|
|
Now we have S1 and S2
right next to the window. |
Followed by S1 and S2
is the Wire Chamber |
Here is the view as
the telescope detector would see it. |
|
|
|
Fred opening the beam stop,
possibly thinking about radiation. |
|
|
|
| An early plot from the Wire Chambers | Computers NEVER die! |
|
|
|
| Roberto P.I. |
|
|
|
| MMmmmmmm Muons! | Dessert. |
|
|
|
|
| The sun setting on the PSI Valley. | The Hills are Alive ... | Bilingual |